The heavy end of the data center.
Heavy-load handling for rack integration and deployment.
Equip your integration hall for heavier racks, changing volumes and work without an overhead crane. HUBTEX and Genkinger connect assembly, loading, site transport and final placement.
HUBTEX: heavy and multidirectional transport.
Genkinger: low-lift, high-lift and special-load handling.
Handling across your project
Server racks & network cabinets
Connect assembly, testing and dispatch with low-lift transport and high-lift positioning configured for your rack integration workflow.
Prefabricated buildings
Move panels and steel frames through production, and plan heavy transport for complete factory-built modules from assembly to dispatch.
Frequently asked questions
How fast can equipment be available?
Standard models can often be delivered at short notice; rental units may be available faster. Send us your load and timeline and we respond with concrete availability within one business day.
Can we rent instead of buy?
Yes. Purchase, rental, and rent-to-own are available depending on vehicle, configuration, location, and timing.
Is the equipment suitable for data hall floors?
Battery-electric drives, non-marking tires, and oil-free options are available. Tell us your floor and cleanliness requirements and we configure accordingly.
What capacities do you cover?
From pallet trucks for racks and cabinets up to platform transporters for 140,000+ lbs. Racks, reels, transformers, switchgear, chillers, and building modules are everyday loads.
Who services the equipment in North America?
HUBTEX North America coordinates service and parts; coverage details depend on your location — ask us with your zip code.
Plan your handling setup
Share your load weight and dimensions, pickup points, route, site ZIP code and start date. Ask HUBTEX North America for a suitable configuration, current availability and rental or purchase options.