Genkinger mobile coil manipulator holding a vertical coil beside a payoff reel
Side view of the Genkinger manipulator with its tilting platform raised
Genkinger coil manipulator picking up a flat metal coil with the eye facing up
Genkinger mobile coil manipulator holding a vertical coil beside a payoff reel
Side view of the Genkinger manipulator with its tilting platform raised
Genkinger coil manipulator picking up a flat metal coil with the eye facing up

Genkinger 90° Coil Manipulator

Pick up a coil with its eye facing up, turn it 90° and load it onto a payoff reel with one mobile vehicle.

  • 90° coil rotation
  • Direct payoff-reel loading
  • Small-coil adapter in the documented installation

Use this configuration when coils are picked up flat and the line requires an upright coil. The manipulator combines pickup, the 90° turn and loading at the payoff reel in one vehicle, so the handoff can be planned as a single operation.

For a retrofit, review the storage position, turning space and reel approach together. Include the clearance around the mandrel and the smallest coil size in your specification so the team can assess whether an adapter is needed.

Contact our product experts

From flat coil to payoff reel
Genkinger coil manipulator picking up a flat metal coil with the eye facing up

The coil starts with its eye facing up. The manipulator picks it up in that orientation, turns it so the eye faces sideways, and positions it at the reel. The pickup and reel interfaces both matter: a coil that fits the transporter still has to clear nearby equipment as it turns and approaches the reel.

At a ceiling systems plant, Genkinger supplied two vehicles for a process previously split among a forklift, a tilt table and an overhead crane with a C-hook. Each vehicle could perform the full sequence. The installation also used an adapter for smaller coils.

What to specify for your line
  • Heaviest coil and the full range of outside diameters, widths and inside diameters.
  • Coil orientation at pickup and how the coil is supported in storage or staging.
  • Payoff reel or mandrel height, loading direction and clearance around the reel.
  • Route width and overhead clearance, including the area needed to turn the coil.

Include a drawing or photo of the pickup point and reel if the line already exists.